South Addition, Phase 2, Update 7
The cinderblock core of walls of the new South Addition that border the existing building are now complete! You can now see how far the addition extends past the end of the current building and where openings are left for the doorways and hallways connecting the addition to the existing building to the addition. Additional cinderblocks are piled to await the construction of the outer walls of the addition . At the same time, the construction team is laying the water and sewage pipes, and connecting them to existing piping, so that the concrete slab under the South Addition can be poured. In the coming weeks, the steel beams used to create the framework of the Addition will be erected, and we will get a real sense of the size and shape of the Addition!